smarten.
← Back to work

New-build, Velká Ohrada

Location
Prague · Velká Ohrada
Year
2025
[ hero photo placeholder ]

▪ Brief

Completing the electrical installation of a new-build in parallel with interior renovation — new circuits, new switches, a dedicated sub-panel for LED PSUs and Shelly RGBW PM Pro modules. Structured cabling for the network alongside, with a UniFi Dream Wall as the backbone and Home Assistant handling central control.

▪ Scope

  • /01 Full electrical distribution for the new-build — fresh circuits, RCD protection, all-new switches throughout
  • /02 Dedicated sub-panel for LED PSUs and Shelly RGBW PM Pro modules
  • /03 Structured cabling (Cat 6A) to every room — LAN, AP and camera drops
  • /04 UniFi Dream Wall as the network and security backbone
  • /05 Home Assistant as the central control over Shelly modules, ready to integrate UniFi and future devices

▪ Technology

  • Shelly
  • Home Assistant
  • UniFi

▪ Timeline

  1. Week 1 Survey and wiring plan together with the interior designer.
  2. Weeks 2–3 Power distribution, main panel and dedicated LED sub-panel.
  3. Week 4 Structured cabling, UniFi Dream Wall and AP drops.
  4. Week 5 Shelly RGBW PM Pro fitted, Home Assistant configured.
  5. Week 6 Testing, UniFi/HA integration, handover.

Let's get started

Get a quote →