← Back to work
New-build, Velká Ohrada
- Location
- Prague · Velká Ohrada
- Year
- 2025
[ hero photo placeholder ]
▪ Brief
Completing the electrical installation of a new-build in parallel with interior renovation — new circuits, new switches, a dedicated sub-panel for LED PSUs and Shelly RGBW PM Pro modules. Structured cabling for the network alongside, with a UniFi Dream Wall as the backbone and Home Assistant handling central control.
▪ Scope
- /01 Full electrical distribution for the new-build — fresh circuits, RCD protection, all-new switches throughout
- /02 Dedicated sub-panel for LED PSUs and Shelly RGBW PM Pro modules
- /03 Structured cabling (Cat 6A) to every room — LAN, AP and camera drops
- /04 UniFi Dream Wall as the network and security backbone
- /05 Home Assistant as the central control over Shelly modules, ready to integrate UniFi and future devices
▪ Technology
- Shelly
- Home Assistant
- UniFi
▪ Timeline
- Week 1 Survey and wiring plan together with the interior designer.
- Weeks 2–3 Power distribution, main panel and dedicated LED sub-panel.
- Week 4 Structured cabling, UniFi Dream Wall and AP drops.
- Week 5 Shelly RGBW PM Pro fitted, Home Assistant configured.
- Week 6 Testing, UniFi/HA integration, handover.
Let's get started
Get a quote →